fa fa-chevron-left Press Release

Why You Should Engage Professionals To Install Standing Seam Cladding Tuesday, May 30th, 8:00 AM
Standing Seam Cladding Installation Guide

Windsor, Australia - May 30, 2023 / HK Roofing /

Why You Should Engage Professionals To Install Standing Seam Cladding

standing seam cladding

Preparing to Install Standing Seam Cladding

Preparing to install standing seam cladding, which can be made from roofing materials like copper and aluminum, is an essential stage in a successful installation with a visually appealing design. It is important to make sure that the necessary cladding material for the job is on-site, and that any risks and safety considerations are taken into account before installation begins. You'll also want to gather information on the best products to use and understand the cladding profiles, including rib height and panel seams, for various types of buildings and roofs. Utilizing the expertise of professionals can help you determine the best option and solution for your project. 

Materials. A complete list of the materials and associated parts needs to be established prior to arrival at the job site. This list should include not only all the basic components of standing cladding, such as panels, clips, and rib profiles but also any items needed to attach or secure the panels in place. Additionally, specialized equipment necessary for fastening, cutting, or ensuring flexibility at joints or pitch transitions may be required. Thus, it is highly recommended that you call professionals to at the very least assist you with the installation. Lastly, choose a material that is suited to your area. For beachside areas standing seam cladding in Elwood need to be resistant to salt, high winds, and rust.

Safety Considerations. Working with standing cladding can pose many safety risks if proper precautions are not taken. Adequate fall protection should be provided to personnel working at elevated levels such as scaffolds or ladders. Fire safety features such as noncombustible insulation and eaves ventilation must also be addressed during the preparation stages. Be aware that Work Safe Victoria has clear policies and regulations for work sites around Victoria such as Elwood and the like. When installing standing seam cladding or any other construction work you should be well versed with requirements. You can learn more by visiting WorkSafe Victoria.

Pre-Installation Site Preparation. As part of overall preparations, ensure the surface of the substrate is ready to receive cladding panels before beginning work. All wood surfaces must be clean and dry, without signs of rot or decay, and all condensation issues should be resolved to avoid mold growth later on. Lastly do not forget to ensure you have local council approvals for access to the site from the roadside and approved plans learn more from the City of Port Phillip about standing seam cladding install preparation.

While it is important to take every necessary step to properly prepare for a standing seam cladding installation job, it is just as critical to have a plan for when things go wrong during set-up or while matters progress after that. If you are inexperienced with this type of installation, it is advised you speak with professionals such as HK Roofing first.

Setting Up a Job for Installation

When preparing the workspace, make sure that it is free from any debris or obstructions that could slow down the installation process. Additionally, consider a layout plan if you are installing multiple panels in order to ensure efficient installation.

Onsite delivery of factory-made panels also presents unique challenges that need to be addressed before commencing installation. Once unloading of the panels is complete, it’s important to check off against your delivery list and also inspect all components for any signs of damage or defects. Special attention should be paid to the clips as these are integral to providing a secure connection and getting panel alignment correct. Also, look out for any missing screws – these can easily be overlooked but, without them, the installation will be incomplete.

Having worked through job site preparation, tools selection, and panel inspection steps, you are now ready to start attaching factory-made panels as part of your standing seam cladding installation. These panels come in various colors, lines, and designs which add to the overall performance and versatility of your cladding project. Steel panels, in particular, can come coated with color bonds for added durability and protection, making them suitable even for weather-exposed areas like Australia. If you need something specific, whether it's a unique design or specific lengths, many manufacturers offer custom solutions to cater to your needs and enhance your building's appearance and experience.

  • A study conducted in 2018 found that Standing Seam Cladding is typically most successful when installed over a composite or built-up membrane.
  • Standing Seam Cladding requires standing seams to be touched and locked by hand with a clinching tool.
  • Standing Seam Cladding involves six steps: layout, cutting, interlocking, seaming, sealing, and weatherproofing. There are local council regulations and standards that should be adhered to when installing. 

Attaching the Factory-Made Panels

Once your job is ready, it’s time to attach the factory-made panels. There are multiple hand tools and power tools that can be used for fastening the panels. These could range from pneumatic staplers, screws, hammers, and nail guns. Depending on the material that you are using to construct the panel, the method of attachment must vary to meet your requirements. For example, if you are using wood as your surface material, then nails might be most effective in holding the panel in place and getting a sturdy result. Alternatively, if you or a contractor have chosen to install standing seam cladding onto a metal surface, then self-tapping screws or rivets may be more suitable to use.

The type of installation that you use should depend upon other factors too; these could include: the environmental conditions of where you plan to install the panel; health and safety considerations; strength and durability of the panel; the amount of maintenance required, and so on. Ultimately, rest assured that whichever fastening device you decide to use when attaching the panels will bring about a secure result that will last incredibly long lengths of time - provided they are installed correctly. 

Mounting the Panels on Wall Surfaces

Once the factory-made panels have been attached, the next step in installing standing seam cladding is to mount the panels onto wall surfaces. This is often done using trim screws, with pilot holes drilled into the panel before mounting to ensure they are firmly secured. Some professionals recommend using rivets instead of screws for attaching the panels, as rivets provide increased security and stability; however, screws are typically more cost-effective and can provide ample protection if installed correctly. For added stability, some installers may opt to use a combination of both screws and rivets when mounting the panels.

It is also important to note that the size of the fasteners used should correspond with the dimensions of the panel being mounted. Using larger or smaller fasteners than what is recommended could lead to problems with waterproofing down the line, as well as lower overall stability for the cladding. It is therefore important to make sure all fasteners are properly sized before beginning installation, especially in areas with fluctuating weather conditions.

Fixing the Panels with Rivets and Fasteners

After successfully mounting the panels onto the wall surfaces, it is now time to begin fixing them in place with rivets and fasteners as required, ensuring a long-lasting and high-performance result for your standing seam cladding project. This will ensure a secure installation that won’t wiggle or sag as time progresses, especially crucial for applications like standing seam roofing in regions like Australia, where weather conditions and experience may vary. It will also guarantee greater panel protection from wind damage and wear and tear. The first step, undertaken by our skilled team, is to pre-drill holes into the panels using self-tapping screws or masonry drill bits. It is important to use an appropriate size drill bit in order to accommodate different Australian profiles, the type of fastener that will be used to support and meet the varying needs, and to cater to services such as property management for homeowners.

Once the holes have been drilled, it’s time to select the right kind of fastening device for your building project. Construction often requires materials like corrosion-resistant metal screw rivets, grip rings, or neoprene washers, depending on the application needed. Some may argue in favor of wood screws due to their beautiful aesthetic qualities, but it is important to weigh this against the risk of weakening the fastening ability as wood screws can become rusty over time. When selecting rivets and fasteners, consider different qualities such as rust resistance, strength, rigidity, durability, and corrosion protection before making your choice. One of the advantages of using the right fasteners for standing seam roofing is the added durability and longevity it provides at an affordable price for homeowners.

The next step is to free up enough space for drilling and setting points for fastening panels into their respective positions. Make sure to measure correctly so there are no discrepancies down the line. For extra security, consider using a double-locking system on both ends so that panels are held firmly together and cannot get loose over time. Such an arrangement can also provide extra sound insulation benefits above what single-locked systems would offer. Moving forward, proper measuring and setting points are essential for ensuring a good quality finish and a secure installation for standing seam cladding systems, which ultimately affects the project's exterior aesthetics and the property's overall value.

Measuring and Setting Points

Measuring and setting points is the next important step in installing standing seam cladding. This is done by using metal measuring tapes to get accurate measurements of each panel of cladding to be installed. These measurements should then be transferred out onto the wall at various intervals, providing distinct points for fixing the panels. After measuring and setting out the points, they should be marked out in a way that allows them to be seen clearly while ensuring they are level with each other. Additionally, flashings may be required to provide further support and waterproofing. Different techniques may provide better results based on the shape of the wall and the type of panels being installed, whether they are stainless steel, aluminum, or zinc. Whether working on interior, commercial, or residential projects, some contractors find it useful to draw guidelines directly onto the wall when installing metal roofing or cladding, while others prefer taping a template to the wall before making distinct marks or cutting into it with a sharp knife. This is applicable for both industrial and house construction projects, ensuring our team delivers the best services for property owners.

No matter which method you choose, it’s important to ensure accuracy and precision as any misalignment of points can lead to problems such as sloping walls or gaps in between panels and dissatisfied homeowners. Taking your time during this step pays off as it can drastically reduce mistakes further down the line. Once all points have been measured and estimated, it's time to start fixing the panels with rivets and fasteners according to these markings. With everything in place and ready for installation, only a few more finishing touches are needed in order to complete the job. It's essential to explore different options and carefully read reviews before proceeding, to ensure the best outcome.

Finishing Touches to Finish the Job

Once the measurements and setting points of the metal cladding have been completed, it is time to begin the finishing touches of the project. Finishing touches are arguably the most important part of installing standing seam cladding, especially for Australian applications, because they ensure that the installation will be secure and long-lasting. Here are some tips to help you complete this last stage of the job, ensuring that your standing seam cladding has the desired style and appearance for residential, commercial, or industrial buildings:

First, check that all joints between pieces of zincalume metal are properly sealed with tar and mastic sealant. Additionally, make sure that all screws and nails used in the installation process are completely flush with the metal so that no water can seep behind them. It is also important to inspect for any damage or corrosion on any pieces before sealing them -- replace any damaged parts as needed to maintain the appearance and longevity of your cladding.

The next step is to make sure all edges are finished correctly and securely. This can be done with caulk, urethane foam, silicone caulking, or other materials suitable for cladding projects. These measures will help to prevent dirt buildup on outside edges, as well as provide a more finished look. Once this has been completed, the last step is to paint or coat the metal with a protective finish. This will help protect against weathering and rusting caused by sun, rain, hail, or snow over time, and also offer various stylish finishes to choose from.

Call Us Now For Standing Seam Cladding Advice

Ultimately, while there can be debate over whether it is necessary or cost-effective to complete these finishing touches when installing standing seam cladding, the truth is that they are an essential part of a successful installation project. Properly sealed joints, edges finished correctly, and a protective coating on metal panels all contribute to a high-quality end product that will not need repairs anytime soon—decreasing maintenance costs while increasing customer satisfaction in the long run. HK Roofing is an experienced operator and services all areas across Melbourne in suburbs such as Elwood and Windsor. Give them a call to discuss your standing seam cladding requirements.

Responses to Common Questions with Explanations

What are the steps for installing a standing seam cladding system?

Step 1: Measure and Cut the Panels - First, you will need to measure out the area in which you plan to install the cladding. Once you have determined the measurements, use a circular saw and metal blade to cut the panels to size.

Step 2: Secure Mounting Strips - Using structural screws, secure mounting strips to the vertical structure that will hold the roof or wall cladding in place. Make sure they are properly secured before moving on to the next step.

Step 3: Install the First Panel - Starting at one edge, slide one panel into its mounting strip and carefully lower it until it is flush with the mounting strip.

Step 4: Snap Seams on Adjacent Panels - Using a mallet, snap the seams of two adjacent panels together so that it forms an even joint. Make sure to leave space between each end of the combined panels for expansion and contraction due to heat and moisture.

Step 5: Secure Panels With Clips - Use screw clips or clips with nail-like points to secure either side of the panel from Step 4 into place. Ensure that they are aligned properly and flush against each stud.

Step 6: Install Adjacent Panels in the Same Manner - Continue with steps 3 through 5 until all of your panels are securely installed and your standing seam cladding system is complete!

Contact Information:

HK Roofing

103B Henry St, Windsor VIC 3181
Windsor, 3181
Australia

Hans Mills
+61 3 9119 5325
https://www.hkroofingau.com/

Original Source: https://www.hkroofingau.com/blog/install-standing-seam-cladding/

Terms & Conditions Privacy Policy

© {{ new Date().getFullYear() }} Archive Place.